ResearchSpace

Development of a road materials database: Interim Report: 1st draft

Show simple item record

dc.contributor.author Jones, DJ
dc.contributor.author Paige-Green, P
dc.date.accessioned 2009-01-30T09:44:30Z
dc.date.available 2009-01-30T09:44:30Z
dc.date.issued 2003-03
dc.identifier.citation Jones, D and Paige-Green, P. 2003. Development of a road materials database: Interim Report: 1st draft. Contract Report, CR-2003/25, pp 53 en
dc.identifier.uri http://hdl.handle.net/10204/2947
dc.description.abstract The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test data. A modular approach has been used to minimise processing time. It is recommened that a standard format for all future as-built/completion data be adopted by Gautrans and its appointed consultants and contractors to allow cost-effective data capture, once the database has been commissioned. en
dc.language.iso en en
dc.publisher CSIR en
dc.subject Road amterials database en
dc.subject APT en
dc.subject Accelerated pavement testing en
dc.subject HVS en
dc.subject Heavy vehicle simulator en
dc.subject LTPP en
dc.title Development of a road materials database: Interim Report: 1st draft en
dc.type Report en
dc.identifier.apacitation Jones, D., & Paige-Green, P. (2003). <i>Development of a road materials database: Interim Report: 1st draft</i> CSIR. Retrieved from http://hdl.handle.net/10204/2947 en_ZA
dc.identifier.chicagocitation Jones, DJ, and P Paige-Green <i>Development of a road materials database: Interim Report: 1st draft.</i> CSIR, 2003. http://hdl.handle.net/10204/2947 en_ZA
dc.identifier.vancouvercitation Jones D, Paige-Green P. Development of a road materials database: Interim Report: 1st draft. 2003 [cited yyyy month dd]. Available from: http://hdl.handle.net/10204/2947 en_ZA
dc.identifier.ris TY - Report AU - Jones, DJ AU - Paige-Green, P AB - The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test data. A modular approach has been used to minimise processing time. It is recommened that a standard format for all future as-built/completion data be adopted by Gautrans and its appointed consultants and contractors to allow cost-effective data capture, once the database has been commissioned. DA - 2003-03 DB - ResearchSpace DP - CSIR KW - Road amterials database KW - APT KW - Accelerated pavement testing KW - HVS KW - Heavy vehicle simulator KW - LTPP LK - https://researchspace.csir.co.za PY - 2003 T1 - Development of a road materials database: Interim Report: 1st draft TI - Development of a road materials database: Interim Report: 1st draft UR - http://hdl.handle.net/10204/2947 ER - en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record