dc.contributor.author |
Jones, DJ
|
|
dc.contributor.author |
Paige-Green, P
|
|
dc.date.accessioned |
2009-01-30T09:44:30Z |
|
dc.date.available |
2009-01-30T09:44:30Z |
|
dc.date.issued |
2003-03 |
|
dc.identifier.citation |
Jones, D and Paige-Green, P. 2003. Development of a road materials database: Interim Report: 1st draft. Contract Report, CR-2003/25, pp 53 |
en |
dc.identifier.uri |
http://hdl.handle.net/10204/2947
|
|
dc.description.abstract |
The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test data. A modular approach has been used to minimise processing time. It is recommened that a standard format for all future as-built/completion data be adopted by Gautrans and its appointed consultants and contractors to allow cost-effective data capture, once the database has been commissioned. |
en |
dc.language.iso |
en |
en |
dc.publisher |
CSIR |
en |
dc.subject |
Road amterials database |
en |
dc.subject |
APT |
en |
dc.subject |
Accelerated pavement testing |
en |
dc.subject |
HVS |
en |
dc.subject |
Heavy vehicle simulator |
en |
dc.subject |
LTPP |
en |
dc.title |
Development of a road materials database: Interim Report: 1st draft |
en |
dc.type |
Report |
en |
dc.identifier.apacitation |
Jones, D., & Paige-Green, P. (2003). <i>Development of a road materials database: Interim Report: 1st draft</i> CSIR. Retrieved from http://hdl.handle.net/10204/2947 |
en_ZA |
dc.identifier.chicagocitation |
Jones, DJ, and P Paige-Green <i>Development of a road materials database: Interim Report: 1st draft.</i> CSIR, 2003. http://hdl.handle.net/10204/2947 |
en_ZA |
dc.identifier.vancouvercitation |
Jones D, Paige-Green P. Development of a road materials database: Interim Report: 1st draft. 2003 [cited yyyy month dd]. Available from: http://hdl.handle.net/10204/2947 |
en_ZA |
dc.identifier.ris |
TY - Report
AU - Jones, DJ
AU - Paige-Green, P
AB - The data required for a road materials database has been identified and a basic structure formulated. A set of Excel workbooks and associated worksheets has been developed as a foundation for the database and as an interim means of gathering test data. A modular approach has been used to minimise processing time. It is recommened that a standard format for all future as-built/completion data be adopted by Gautrans and its appointed consultants and contractors to allow cost-effective data capture, once the database has been commissioned.
DA - 2003-03
DB - ResearchSpace
DP - CSIR
KW - Road amterials database
KW - APT
KW - Accelerated pavement testing
KW - HVS
KW - Heavy vehicle simulator
KW - LTPP
LK - https://researchspace.csir.co.za
PY - 2003
T1 - Development of a road materials database: Interim Report: 1st draft
TI - Development of a road materials database: Interim Report: 1st draft
UR - http://hdl.handle.net/10204/2947
ER -
|
en_ZA |