dc.contributor.author |
Hauptfleisch, Dries
|
|
dc.contributor.author |
Lazarus, Spencer
|
|
dc.contributor.author |
Knoetze, Theunis P
|
|
dc.contributor.author |
Liebenberg, Sybert
|
|
dc.date.accessioned |
2008-01-17T08:52:56Z |
|
dc.date.available |
2008-01-17T08:52:56Z |
|
dc.date.issued |
2007-05 |
|
dc.identifier.citation |
Hauptfleisch, et al. 2007. Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification. Construction for development; CIB World Building Congress, Cape Town, South Africa, 14-18 May, 2007, pp.1-10. |
en |
dc.identifier.uri |
http://hdl.handle.net/10204/1850
|
|
dc.description.abstract |
It is imperative that capacity building and black economic empowerment take place in South Africa at a rapid pace. This requires that, inter alia, strategies be implemented in order to create sustainable construction enterprises from a low base, in the shortest possible time. An empowered model has thus been created to ensure the rapid development of emerging construction contractors. This model has a sound theoretical base, is supported by extensive filed research and has been introduced in practice. The results were continuously measured and presented in statistical and diagrammatic format. |
en |
dc.language.iso |
en |
en |
dc.subject |
Emerging construction contractors |
en |
dc.subject |
Contractor development models |
en |
dc.subject |
Mentoring |
en |
dc.subject |
Project management |
en |
dc.title |
Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification |
en |
dc.type |
Conference Presentation |
en |
dc.identifier.apacitation |
Hauptfleisch, D., Lazarus, S., Knoetze, T. P., & Liebenberg, S. (2007). Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification. http://hdl.handle.net/10204/1850 |
en_ZA |
dc.identifier.chicagocitation |
Hauptfleisch, Dries, Spencer Lazarus, Theunis P Knoetze, and Sybert Liebenberg. "Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification." (2007): http://hdl.handle.net/10204/1850 |
en_ZA |
dc.identifier.vancouvercitation |
Hauptfleisch D, Lazarus S, Knoetze TP, Liebenberg S, Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification; 2007. http://hdl.handle.net/10204/1850 . |
en_ZA |
dc.identifier.ris |
TY - Conference Presentation
AU - Hauptfleisch, Dries
AU - Lazarus, Spencer
AU - Knoetze, Theunis P
AU - Liebenberg, Sybert
AB - It is imperative that capacity building and black economic empowerment take place in South Africa at a rapid pace. This requires that, inter alia, strategies be implemented in order to create sustainable construction enterprises from a low base, in the shortest possible time. An empowered model has thus been created to ensure the rapid development of emerging construction contractors. This model has a sound theoretical base, is supported by extensive filed research and has been introduced in practice. The results were continuously measured and presented in statistical and diagrammatic format.
DA - 2007-05
DB - ResearchSpace
DP - CSIR
KW - Emerging construction contractors
KW - Contractor development models
KW - Mentoring
KW - Project management
LK - https://researchspace.csir.co.za
PY - 2007
T1 - Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification
TI - Integrated emerging contractor development model for the construction industry: practical implementation and statistical quantification
UR - http://hdl.handle.net/10204/1850
ER -
|
en_ZA |