dc.contributor.author |
Glisson, FJ
|
|
dc.contributor.author |
Kullmann, D
|
|
dc.date.accessioned |
2007-12-05T12:38:44Z |
|
dc.date.available |
2007-12-05T12:38:44Z |
|
dc.date.issued |
1998-08 |
|
dc.identifier.citation |
Glisson, FJ and Kullmann, D. 1998. Problems associated with the use of rapid yielding hydraulic props. Safety in Mines Research Advisory Committee, GAP 442, August, 1998, pp 1-73 |
en |
dc.identifier.uri |
http://hdl.handle.net/10204/1753
|
|
dc.description.abstract |
This report deals with the factors affecting the effective use of rapid yielding hydraulic props (RYHP’s) in the South African gold mines. Wherever possible, such factors have been quantified in an attempt to provide guidelines for obtaining the maximum benefit from the use of hydraulic prop systems. A literature survey indicated that a similar report was produced in the 1970’s. That report dealt with the introduction of hydraulic props into the gold mining industry. This report concentrates on the new generation “20 - 40 ton” hydraulic props. Similar problems are raised in both reports which indicate that these issues have not been effectively addressed. |
en |
dc.language.iso |
en |
en |
dc.subject |
SIMRAC |
en |
dc.subject |
GAP 442 |
en |
dc.subject |
Rapid Yielding Hydraulic Props |
en |
dc.subject |
RYHP |
en |
dc.subject |
Hydraulic prop systems |
en |
dc.title |
Problems associated with the use of rapid yielding hydraulic props. |
en |
dc.type |
Conference Presentation |
en |
dc.identifier.apacitation |
Glisson, F., & Kullmann, D. (1998). Problems associated with the use of rapid yielding hydraulic props. http://hdl.handle.net/10204/1753 |
en_ZA |
dc.identifier.chicagocitation |
Glisson, FJ, and D Kullmann. "Problems associated with the use of rapid yielding hydraulic props." (1998): http://hdl.handle.net/10204/1753 |
en_ZA |
dc.identifier.vancouvercitation |
Glisson F, Kullmann D, Problems associated with the use of rapid yielding hydraulic props; 1998. http://hdl.handle.net/10204/1753 . |
en_ZA |
dc.identifier.ris |
TY - Conference Presentation
AU - Glisson, FJ
AU - Kullmann, D
AB - This report deals with the factors affecting the effective use of rapid yielding hydraulic props (RYHP’s) in the South African gold mines. Wherever possible, such factors have been quantified in an attempt to provide guidelines for obtaining the maximum benefit from the use of hydraulic prop systems. A literature survey indicated that a similar report was produced in the 1970’s. That report dealt with the introduction of hydraulic props into the gold mining industry. This report concentrates on the new generation “20 - 40 ton” hydraulic props. Similar problems are raised in both reports which indicate that these issues have not been effectively addressed.
DA - 1998-08
DB - ResearchSpace
DP - CSIR
KW - SIMRAC
KW - GAP 442
KW - Rapid Yielding Hydraulic Props
KW - RYHP
KW - Hydraulic prop systems
LK - https://researchspace.csir.co.za
PY - 1998
T1 - Problems associated with the use of rapid yielding hydraulic props
TI - Problems associated with the use of rapid yielding hydraulic props
UR - http://hdl.handle.net/10204/1753
ER -
|
en_ZA |