The FRI was requested by the Metallurgical Manager, contracts Division, Fraser and Chalmers (S.A) (Pty) Ltd. to conduct an acceptance test on the newly commissioned Wemco Drum at Phoenix Colliery, Beath Section, on behalf of Johannesburg Consolidated Investment Co. Ltd.
Reference:
Streicher, S. 1965. Report on the results obtained from an acceptance test carried out on the coal preparation plant at Phoenix colliery Beath section. http://hdl.handle.net/10204/12956 .
Streicher, S. (1965). Report on the results obtained from an acceptance test carried out on the coal preparation plant at Phoenix colliery Beath section Retrieved from http://hdl.handle.net/10204/12956
Streicher, SF Report on the results obtained from an acceptance test carried out on the coal preparation plant at Phoenix colliery Beath section. 1965. http://hdl.handle.net/10204/12956
Streicher S. Report on the results obtained from an acceptance test carried out on the coal preparation plant at Phoenix colliery Beath section. 1965 [cited yyyy month dd]. Available from: http://hdl.handle.net/10204/12956