The tests reported herein were carried out on behalf of Messrs. Mitchell Engineering (Pty) Ltd., the suppliers of the Boiler Plant, to determine the quantity of fly-ash leaving the boiler. A preliminary test was carried out on the 20th December, 1965. An M.C.R. test was performed.
Reference:
Erasmus, T. 1966. Report on dust collector tests at Komati Power Station 21st December 1965. http://hdl.handle.net/10204/12950 .
Erasmus, T. (1966). Report on dust collector tests at Komati Power Station 21st December 1965 Retrieved from http://hdl.handle.net/10204/12950
Erasmus, TC Report on dust collector tests at Komati Power Station 21st December 1965. 1966. http://hdl.handle.net/10204/12950
Erasmus T. Report on dust collector tests at Komati Power Station 21st December 1965. 1966 [cited yyyy month dd]. Available from: http://hdl.handle.net/10204/12950